Contact form

Please fill out the form below. We will get back to you as soon as possible.

Get In Touch

 Location

Accessibility highlights:

  • Major District Road (MDR) : 30 connecting to NH 8
  • National Highway NH 8: 8 KM
  • Boisar Station: 17 Km ( Proposed and Planned govt bridge will reduce it to 12 Km)
  • Mumbai Airport: 100 KM
  • JNPT Port: 140 Km
  • Rail connectivity with all major stations.

WIP highlights:

  • The under construction Vadhawan sea port is 40 kms from the site which will be a deep draft port of 20 mtrs depth that can handle bigger ships (mother vessels).
  • Under construction Mumbai Vadodara Expressway is 8km from the site.
  • The Mumbai BKC- Ahmedabad bullet train is proposed to have BOISAR as one of the 11 stations. The site for the railway station is 12km.

VIEW IMAGES pdf Size here   MAP 161 KB
Home Key Features Location News Contact About us
Copyright © 2021-2024 Dynamic Entrepreneur. All rights reserved.